33 KV Line Single Pole Erection work necessary Process follow for Erection of 33 KV Line Single Pole .
1- After Survey Done ,BOQ Prepartion & Approval BOQ of Feeder Separation, Feeder Bifurcation Then work Started Particular Locations.
2- For Erection of 33 KV Line Pole is necessary part.
3- Rural Project for 33 KV Line- 9.1 Mtr(280 kg) Long PCC Pole used.
- Urban Project for 33 KV Line - 13 Mtr(37.1 kg/Mtr) H-Beam Pole used.
4- Tractor mounted Pole pit digger & Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit digger & Erected The Pole .
4- During Erection of Pole Full Concerting (mixture of material - 1:3:6 Cement: Sand: Aggregate) fill at Pit hole in Rural Project .
For Urban Project Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate) done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting Back Clamp( Angle 75*75*6 mm) fitted in Pole work done during Erection of 33 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 10 to 15 KN done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 33 KV uesd in pole for indicate 33 KV Line Erected & it is Danger.
12- Stay Set 20 mm complete with Turn buckle work done.
13- Stay wire 8.5 kg per Stay set.
4- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.
https://youtu.be/VnpcEn--j9g
1- After Survey Done ,BOQ Prepartion & Approval BOQ of Feeder Separation, Feeder Bifurcation Then work Started Particular Locations.
2- For Erection of 33 KV Line Pole is necessary part.
3- Rural Project for 33 KV Line- 9.1 Mtr(280 kg) Long PCC Pole used.
- Urban Project for 33 KV Line - 13 Mtr(37.1 kg/Mtr) H-Beam Pole used.
4- Tractor mounted Pole pit digger & Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit digger & Erected The Pole .
4- During Erection of Pole Full Concerting (mixture of material - 1:3:6 Cement: Sand: Aggregate) fill at Pit hole in Rural Project .
For Urban Project Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate) done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting Back Clamp( Angle 75*75*6 mm) fitted in Pole work done during Erection of 33 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 10 to 15 KN done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 33 KV uesd in pole for indicate 33 KV Line Erected & it is Danger.
12- Stay Set 20 mm complete with Turn buckle work done.
13- Stay wire 8.5 kg per Stay set.
4- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.