11 KV Line DP Erection work with Complete Description given below- Material is necessary for Erection of 11 KV Line DP.
1- 11 KV Line Pole.(8 mtr PCC Pole for Rural Project & 11 mtr H-Beam Pole in Urban project).
2- Pole center to center Distance between one pole to another is 1500 mm(1.5 meter)
3- Pit digging
4- Transportation of pole
5- Stone Bolder (Size 10 mm or above) & Compacted Soil (60% Stone Bolder & 40% Compacted Soil ) . Note - if Concreting in 11 KV Line project follow Concerting rules as per your Project approval .
6- Top Channel ( Section - 100*50*6 mm & Channel Length- 2200 mm)
7- Supporting Clamp.
8- Horizontal & Cross Bracing( Belting angle & Bracing angle of 11 KV Line)
9- Back clamp
10- Earthing Coil.
11- 11 KV Disc insulator (45 KN).
12- Strain Hardware .
13- Pin insulator 5 KN .
14- Stay Set complete with Turn buckle.
15-Stay wire(5.5 KG per Stay set)
16- Barbed wire (3.5 Kg per pole 14 SWG or SWG GI Wire as per approval)
17- Danger board of 11 KV Line.
18- Galvanised nut, bolt & Washer
For complete Description how to 11 KV Line DP Erection & Material details please prefer link given below-
1- 11 KV Line Pole.(8 mtr PCC Pole for Rural Project & 11 mtr H-Beam Pole in Urban project).
2- Pole center to center Distance between one pole to another is 1500 mm(1.5 meter)
3- Pit digging
4- Transportation of pole
5- Stone Bolder (Size 10 mm or above) & Compacted Soil (60% Stone Bolder & 40% Compacted Soil ) . Note - if Concreting in 11 KV Line project follow Concerting rules as per your Project approval .
6- Top Channel ( Section - 100*50*6 mm & Channel Length- 2200 mm)
7- Supporting Clamp.
8- Horizontal & Cross Bracing( Belting angle & Bracing angle of 11 KV Line)
9- Back clamp
10- Earthing Coil.
11- 11 KV Disc insulator (45 KN).
12- Strain Hardware .
13- Pin insulator 5 KN .
14- Stay Set complete with Turn buckle.
15-Stay wire(5.5 KG per Stay set)
16- Barbed wire (3.5 Kg per pole 14 SWG or SWG GI Wire as per approval)
17- Danger board of 11 KV Line.
18- Galvanised nut, bolt & Washer
For complete Description how to 11 KV Line DP Erection & Material details please prefer link given below-
No comments:
Post a Comment