33 KV Line DP Erection with complete Description in Electrical Distribution work point given below is used for Erection of 33 KV Line DP.
1- 33 KV Line Pole.(9.1 mtr PCC Pole for Rural Project & 13 mtr H-Beam Pole in Urban project)
2- Pit digging
3- Transportation of pole
4- Concerting (1:3:6 of Cement:sand: Aggregate)
5- Top Channel (100*50*6 mm)
6- Supporting Clamp.
7- Horizontal & Cross Bracing
8- Back clamp
9- Earthing Coil.
10- Barbed wire .
11- Danger board
12- Galvanised nut, bolt & Washer
For complete Description how to 33 KV Line DP Erection & Material details please prefer link given below-
https://youtu.be/bpfy6tT96NQ
1- 33 KV Line Pole.(9.1 mtr PCC Pole for Rural Project & 13 mtr H-Beam Pole in Urban project)
2- Pit digging
3- Transportation of pole
4- Concerting (1:3:6 of Cement:sand: Aggregate)
5- Top Channel (100*50*6 mm)
6- Supporting Clamp.
7- Horizontal & Cross Bracing
8- Back clamp
9- Earthing Coil.
10- Barbed wire .
11- Danger board
12- Galvanised nut, bolt & Washer
For complete Description how to 33 KV Line DP Erection & Material details please prefer link given below-
https://youtu.be/bpfy6tT96NQ