33 KV Line Complete Erection work with material Details Process follow-
1- 33 KV Line Erection work Firstly 33 KV Line Single Pole Erection work done.
2- Maintain Average SPan between one pole to another pole.
3- 33 KV Line DP Erection work done.
1- 33 KV Line Single Pole Erection work necessary Process follow for Erection of 33 KV Line Single Pole .
1- After Survey Done ,BOQ Prepartion & Approval BOQ of Feeder Separation, Feeder Bifurcation Then work Started Particular Locations.
2- For Erection of 33 KV Line Pole is necessary part.
3- Rural Project for 33 KV Line- 9.1 Mtr(280 kg) Long PCC Pole used.
- Urban Project for 33 KV Line - 13 Mtr(37.1 kg/Mtr) H-Beam Pole used.
4- Tractor mounted Pole pit digger & Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit digger & Erected The Pole .
4- During Erection of Pole Full Concerting (mixture of material - 1:3:6 Cement: Sand: Aggregate) fill at Pit hole in Rural Project .
For Urban Project Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate) done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting Back Clamp( Angle 75*75*6 mm) fitted in Pole work done during Erection of 33 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 10 to 15 KN done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 33 KV uesd in pole for indicate 33 KV Line Erected & it is Danger.
12- Stay Set 20 mm complete with Turn buckle work done.
13- Stay wire 8.5 kg per Stay set.
4- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.
https://youtu.be/VnpcEn--j9g
2- Pole Distance in 33 KV Line/ 33 KV Line Pole Span Necessary Details given below-
1- During Erection of 33 KV Line Maintain Average Span between Pole to Pole is important for maintain Sag of 33 KV Line & Proper Erection of Line .
2- Measurements Tape is necessary for Decide Actual Average Span in 1 KM Line.
3- Average Span Length For Rural Project- 70 to 100 mtr.
If Raccoon Conductor is used then Standard Average Span is 70 mtr between Pole to Pole in 33 KV Line.
If Dog Conductor is used then Standard Average Span is 80 to 100 mtr between Pole Pole in 33 KV Line.
Note- But in Project Work at Some condition Average Span length decide as per Site Condition.)
4- Average Span Length for Urban Project- 40 mtr .
5- 33 KV Line Rural & Urban Project Pole Details -
9.1 mtr PCC Pole used( Strength - 280 KG).
13 mtr H-Beam Pole, Steel Tubular Pole, Rail Pole used.
13 mtr H-Beam Pole( Weight 37.1 KG/Mtr ).
Also prefer YouTube link given below for Description of Poleto Pole Distance in 33 KV Line/Pole Span in 33 KV Line.
https://youtu.be/pHZys89187I
3- 33 KV Line DP Erection with complete Description in Electrical Distribution work point given below is used for Erection of 33 KV Line DP.
1- 33 KV Line Pole.(9.1 mtr PCC Pole for Rural Project & 13 mtr H-Beam Pole in Urban project)
2- Pit digging
3- Transportation of pole
4- Concerting (1:3:6 of Cement:sand: Aggregate)
5- Top Channel (100*50*6 mm)
6- Supporting Clamp.
7- Horizontal & Cross Bracing
8- Back clamp
9- Earthing Coil.
10- Barbed wire .
11- Danger board
12- Galvanised nut, bolt & Washer
For complete Description how to 33 KV Line DP Erection & Material details please prefer link given below-
https://youtu.be/bpfy6tT96NQ
YouTube Link given below for 33 KV Line Complete Erection work with material Details .
Please follow the link given below-
https://youtu.be/TkyWIsR--OY
https://youtu.be/Cy0Hq9snJtw
1- 33 KV Line Erection work Firstly 33 KV Line Single Pole Erection work done.
2- Maintain Average SPan between one pole to another pole.
3- 33 KV Line DP Erection work done.
1- 33 KV Line Single Pole Erection work necessary Process follow for Erection of 33 KV Line Single Pole .
1- After Survey Done ,BOQ Prepartion & Approval BOQ of Feeder Separation, Feeder Bifurcation Then work Started Particular Locations.
2- For Erection of 33 KV Line Pole is necessary part.
3- Rural Project for 33 KV Line- 9.1 Mtr(280 kg) Long PCC Pole used.
- Urban Project for 33 KV Line - 13 Mtr(37.1 kg/Mtr) H-Beam Pole used.
4- Tractor mounted Pole pit digger & Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit digger & Erected The Pole .
4- During Erection of Pole Full Concerting (mixture of material - 1:3:6 Cement: Sand: Aggregate) fill at Pit hole in Rural Project .
For Urban Project Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate) done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting Back Clamp( Angle 75*75*6 mm) fitted in Pole work done during Erection of 33 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 10 to 15 KN done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 33 KV uesd in pole for indicate 33 KV Line Erected & it is Danger.
12- Stay Set 20 mm complete with Turn buckle work done.
13- Stay wire 8.5 kg per Stay set.
4- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.
https://youtu.be/VnpcEn--j9g
2- Pole Distance in 33 KV Line/ 33 KV Line Pole Span Necessary Details given below-
1- During Erection of 33 KV Line Maintain Average Span between Pole to Pole is important for maintain Sag of 33 KV Line & Proper Erection of Line .
2- Measurements Tape is necessary for Decide Actual Average Span in 1 KM Line.
3- Average Span Length For Rural Project- 70 to 100 mtr.
If Raccoon Conductor is used then Standard Average Span is 70 mtr between Pole to Pole in 33 KV Line.
If Dog Conductor is used then Standard Average Span is 80 to 100 mtr between Pole Pole in 33 KV Line.
Note- But in Project Work at Some condition Average Span length decide as per Site Condition.)
4- Average Span Length for Urban Project- 40 mtr .
5- 33 KV Line Rural & Urban Project Pole Details -
9.1 mtr PCC Pole used( Strength - 280 KG).
13 mtr H-Beam Pole, Steel Tubular Pole, Rail Pole used.
13 mtr H-Beam Pole( Weight 37.1 KG/Mtr ).
Also prefer YouTube link given below for Description of Poleto Pole Distance in 33 KV Line/Pole Span in 33 KV Line.
https://youtu.be/pHZys89187I
3- 33 KV Line DP Erection with complete Description in Electrical Distribution work point given below is used for Erection of 33 KV Line DP.
1- 33 KV Line Pole.(9.1 mtr PCC Pole for Rural Project & 13 mtr H-Beam Pole in Urban project)
2- Pit digging
3- Transportation of pole
4- Concerting (1:3:6 of Cement:sand: Aggregate)
5- Top Channel (100*50*6 mm)
6- Supporting Clamp.
7- Horizontal & Cross Bracing
8- Back clamp
9- Earthing Coil.
10- Barbed wire .
11- Danger board
12- Galvanised nut, bolt & Washer
For complete Description how to 33 KV Line DP Erection & Material details please prefer link given below-
https://youtu.be/bpfy6tT96NQ
YouTube Link given below for 33 KV Line Complete Erection work with material Details .
Please follow the link given below-
https://youtu.be/TkyWIsR--OY
https://youtu.be/Cy0Hq9snJtw
No comments:
Post a Comment