Wednesday, July 15, 2020

33 KV Line Conductor Phase to Phase Clearance / 33 KV Line Conductor to Conductor distance

33 KV Line Conductor Phase to Phase Clearance / 33 KV Line Conductor to Conductor distance-

During Erection of 33 KV Line After Erected Pole , Pin insulator , Top clamp ( Single Pole ) , Disc insulator ( Line DP) work done . Then Co Three Phase Conductor work done ( Three Conductor used . Two Conductor in Single Pole Pin insulator groove  & one Conductor erected through Top clamp pin insulator groove .   Pic attached for reference  given below).

Conductor.          Conductor.               Conductor.                     
Left Side              Central                        Right Side   

* Central Conductor to other two side conductor phase to Phase  clearance is 1320 mm.
* Left & Right Side Conductor Phase to Phase Clearance is 1525 mm.


YouTube Link given below for watch video .

https://youtu.be/vm_QmuHSeWk


Thursday, July 9, 2020

Clearance from overhead line to building / Electric Line Ghar se kitni duri per hona chaiye.

Clearance from overhead line to building / Electric Line Ghar se kitni duri per hona chaiye -
Clearance from overhead line to building is necessary for safety purpose & avoid causality from Conductor ,cable  .

Two type  Clearance done between conductor & Building .
1- Horizontal Clearance between conductor & Building .
2- Vertical  Clearance between conductor & Building .

1-  Horizontal Clearance between conductor & Building .

   Line                 Clerance b/w Conductor House

 33 KV Line.            2 MTR.
 11 KV Line.            2 MTR .
 LT Line.                  1.2 MTR

2- Vertical  Clearance between conductor & Building .

 Line                    Clerance b/w Conductor House

 33 KV Line.            3.7 MTR.
 11 KV Line.            3.7 MTR .
 LT Line.                  2.5  MTR

YouTube video link given below-
https://youtu.be/TGZ69-a7uWY


                 











   

Wednesday, July 8, 2020

33 KV Line V-Cross Arm complete Description with material Details

33kV Line V-Cross Arm Complete Description with Material Details.
1- V-Cross arm used for Support & hold Pin insulator
2- used For Proper gap maintain between Conductor during Conductor Stringing.
3-V-Cross arm is Fabrication item. Its make by Fabrication of Channel.

V-Cross arm Material Details for Preparing V-Cross arm
S.No.     Material Description                    Qty. 

1-     M.S.Channel 100*50*6 mm.            1 no. 
          = 1040  mm Long
2-     M.S.Channel 100*50 *6 mm.           1 no. 
          = 940 mm Long
3-     M.S. Angle 65*65*6 mm.                 1 no. 
        =710  mm Long   
4-     M.S. Angle 65*65*6 mm.                 2 no. 
        =510 mm Long   
5-     M.S. Angle 65*65*6 mm.                 2 no. 
        =75 mm Long   
6-     M.S. Angle 50*50*6 mm.                 1 no. 
        =50  mm Long   
7-   Back Cleat M.S Angle.                        2 no.   
      75*40*6 mm.= 300mm long.

8-   M.S. Welded Plate.                              2 no.
       50*50*6.

33 KV V-Cross arm gap between one pin insulator to other pin insulator in V - Shape = 1530 mm.

https://youtu.be/wnoIKhm0ZBc



Tuesday, July 7, 2020

11 KV Line V-Cross Arm Complete Description with material Details.


11 kV Line V-Cross Arm Complete Description with Material Details.
1- V-Cross arm used for Support & hold Pin insulator
2- used For Proper gap maintain between Conductor during Conductor Stringing.
3-V-Cross arm is Fabrication item. Its make by Fabrication of Channel.

V-Cross arm Material Details for Preparing V-Cross arm
S.No.     Material Description           Qty.    Weight

1-      M.S.Channel 75*40*6 mm.    1 no.   4.83 kg
          = 710 mm Long
2-     M.S.Channel 75*40*6 mm.    1 no.   4.32 kg
          = 635 mm Long
3-     M.S. Angle 50*50*6 mm.         1 no.   1.35 kg
        =300 mm Long     
4-   Back Cleat M.S Angle.                 2 no.     3.4 kg
      75*40*6 mm.= 250 mm long.

11 KV V-Cross arm gap between one pin insulator to other pin insulator in V - Shape = 1070 mm.

For know about S.No. 1,2,3,4 & other Details please prefer YouTube link given below👇
https://youtu.be/aCd4yO83QrM


Sunday, July 5, 2020

33 KV Line Single Pole Erection Work with material Details.

33 KV Line Single Pole  Erection work necessary Process follow for Erection of 33 KV Line Single Pole .
1- After Survey Done  ,BOQ Prepartion  & Approval  BOQ of  Feeder Separation, Feeder Bifurcation  Then work Started Particular Locations.
2- For Erection of 33 KV Line Pole is necessary part.
3- Rural Project for 33 KV Line- 9.1 Mtr(280 kg) Long PCC Pole used.
 - Urban Project for 33 KV Line - 13 Mtr(37.1 kg/Mtr)  H-Beam Pole used.
4- Tractor mounted Pole pit digger &  Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit digger & Erected The Pole .
4- During  Erection of Pole  Full Concerting (mixture of material   - 1:3:6  Cement: Sand: Aggregate) fill at  Pit hole in Rural Project .
For Urban Project  Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate)  done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting  Back Clamp( Angle 75*75*6 mm)  fitted in Pole work done during Erection of 33 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 10 to 15 KN  done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban  project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 33 KV uesd in pole for indicate 33  KV Line Erected & it is Danger.
12- Stay Set 20 mm complete with Turn buckle work done.
13- Stay wire 8.5 kg per Stay set.
4- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.



https://youtu.be/VnpcEn--j9g

Monday, June 8, 2020

11 KV Line Single Pole Erection work with material Details.

11 KV Line Single Pole  Erection work necessary Process follow for Erection of 11 KV Line Single Pole .
1- After Survey Done  ,BOQ Prepartion  & Approval  BOQ of Particular Village, Habitation, Feeder Separation, Feeder Bifurcation  Then work Started Particular Locations.
2- For Erection of 11 KV Line Pole is necessary part.
3- Rural Project for 11 KV Line- 8 mtr(140 kg) Long PCC Pole used.
 - Urban Project for 11 KV Line - 11 mtr(37.1 kg/mtr)  H-Beam Pole used.
4- Tractor mounted Pole pit diggier &  Manually( By Labour) Pit digging done.
3- Pit hole done by Tractor mounted Pole pit diggier & Erected The Pole .
4- During  Erection of Pole Stone Bolder (60 % ) & Compacted Soil (40 %) fill at  Pit hole in Rural Project .
For Urban Project  Pit hole Full Concerting with Composition ( 1:3:6 Cement:sand: Aggregate)  done from Bottom of pit hole to ground level.
5- V - Cross arm & V Cross arm supporting  Back Clamp fitted in Pole work done during Erection of 11 KV Line.
6- Pole Top portion one Top Clamps done.
7- Three no. Pin insulator 5 KN done ( Two pin insulator at V - Cross arm & one pin insulator at Top Clamps).
Note - Some urban  project no Top clamp used.
8- one no. Earthing Coil done.
9- Earthing for PCC Pole done as per approval.
10- Barbed wire (3.5 kg 12 SWG or 14 SWG GI Wire used as per approval).
11- Danger Board of 11 KV uesd in pole for indicate 11 KV Line Erected & it is Danger.
12- Stay Set 16 mm complete with Turn buckle work done.
13- Stay wire 5.5 Kg per pole done.
14- Stay Pit digging & Concerting work necessary for Erection Stay set with Stay wire.
15- Galvanised Nut, Bolt & Washer used.


https://youtu.be/tybhC1Caj5c


Friday, June 5, 2020

Pole to Pole Distance in 11 KV line/Pole to Pole Span in 11 KV Line

Pole to Pole Distance in 11 KV Line/ 11  KV Line Pole Span Necessary Details given below-
1- During Erection of 11  KV Line Maintain Average  Span  between Pole to Pole is important for maintain Sag of 11 KV Line & Proper Erection of Line .
2- Measurements Tape is necessary for Decide Actual  Average Span in 1 KM Line.
3- Average Span Length For Rural Project -  70 mtr
Mostly Rabbit conductor is used in 11 KV Line for Rural Work.
Rabbit Conductor - 55 SQ.mm

Rabbit Conductor Current carrying capacity (Ampere) - 139 to 191 A
Note-  But in  Project Work at  Some condition Average Span length decide as per Site Condition.)
4- Average Span Length for Urban Project-  40 mtr .
5- 11 KV Line Rural & Urban  Project Pole Details -
8  mtr PCC Pole used( Strength - 140 KG).
11 mtr H-Beam Pole, Steel Tubular Pole, Rail Pole used.
11 mtr H-Beam Pole(  Weight 37.1 KG/Mtr ).

Also prefer YouTube link given below for Description of  Poleto Pole Distance in 11  KVLine/Pole Span in 11 KV Line.
https://youtu.be/G-pU9vVrfcU






How many motors of 5 hp can be driven by a 25 KVA transformer?

How many motors of 5 hp can be driven by a 25 KVA transformer YouTube video link given below-  YouTube video Link